Pages that link to "Item:Q5948196"
From MaRDI portal
The following pages link to A robust genetic algorithm for resource allocation in project scheduling (Q5948196):
Displaying 36 items.
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling (Q342339) (← links)
- Statistical design of genetic algorithms for combinatorial optimization problems (Q410570) (← links)
- An iterated local search algorithm for a place scheduling problem (Q474475) (← links)
- A fuzzy time-dependent project scheduling problem (Q497277) (← links)
- Multiindex optimal production planning problems (Q612224) (← links)
- New concepts for activity float in resource-constrained project management (Q622136) (← links)
- A neurogenetic approach for the resource-constrained project scheduling problem (Q709106) (← links)
- Experimental investigation of heuristics for resource-constrained project scheduling: an update (Q858327) (← links)
- Improving simulated annealing with variable neighborhood search to solve the resource-constrained scheduling problem (Q954251) (← links)
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (Q1037664) (← links)
- Activity list representation for a generalization of the resource-constrained project scheduling problem (Q1042097) (← links)
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. (Q1399573) (← links)
- A biased random-key genetic algorithm for the project scheduling problem with flexible resources (Q1667401) (← links)
- An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources (Q1698276) (← links)
- A multiagent evolutionary algorithm for the resource-constrained project portfolio selection and scheduling problem (Q1718076) (← links)
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (Q1762055) (← links)
- Justification and RCPSP: a technique that pays (Q1772841) (← links)
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics (Q1776952) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (Q2273894) (← links)
- Forecasting government bond spreads with heuristic models: evidence from the eurozone periphery (Q2288926) (← links)
- A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem (Q2355885) (← links)
- Genetic algorithm for the resource-constrained project scheduling problem (Q2401044) (← links)
- A hybrid metaheuristic for the resource-constrained project scheduling problem (Q2433434) (← links)
- A hybrid genetic algorithm for the resource-constrained project scheduling problem (Q2455614) (← links)
- A quantitative approach for scheduling activities to reduce set-up in multiple machine lines (Q2467267) (← links)
- Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem (Q2482379) (← links)
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling (Q2519076) (← links)
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling (Q2570161) (← links)
- A lexicographic approach to the robust resource-constrained project scheduling problem (Q2968494) (← links)
- Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art (Q3432703) (← links)
- New representation to reduce the search space for the resource-constrained project scheduling problem (Q3539808) (← links)
- A MULTI-OBJECTIVE RISK-BASED FRAMEWORK FOR MISSION CAPABILITY PLANNING (Q3633963) (← links)
- A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem (Q5246811) (← links)
- A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem (Q5438568) (← links)
- Dynamic resource allocation and collaborative scheduling in R\&D and manufacturing processes of high-end equipment with budget constraint (Q6043112) (← links)