Pages that link to "Item:Q5948197"
From MaRDI portal
The following pages link to Project scheduling with multiple modes: A genetic algorithm (Q5948197):
Displaying 45 items.
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm (Q400054) (← links)
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem (Q415556) (← links)
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (Q421579) (← links)
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem (Q433107) (← links)
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres (Q439612) (← links)
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies (Q526633) (← links)
- Project scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous grid (Q535971) (← links)
- Applying local rescheduling in response to schedule disruptions (Q613784) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- A double genetic algorithm for the MRCPSP/max (Q709102) (← links)
- Reactive scheduling in the multi-mode RCPSP (Q709110) (← links)
- When it is worthwhile to work with the stochastic RCPSP? (Q835549) (← links)
- Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q859913) (← links)
- Skilled workforce scheduling in service centres (Q954927) (← links)
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models (Q983626) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Scheduling projects with limited number of preemptions (Q1025235) (← links)
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (Q1037664) (← links)
- An equitable approach to the payment scheduling problem in project management (Q1590032) (← links)
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem (Q1651597) (← links)
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case (Q1681264) (← links)
- An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources (Q1698276) (← links)
- Scheduling quay cranes and yard trucks for unloading operations in container ports (Q1730674) (← links)
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem (Q1752254) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem (Q1992769) (← links)
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty (Q2156293) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (Q2256244) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- Benders decomposition, Lagrangean relaxation and metaheuristic design (Q2271124) (← links)
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q2432851) (← links)
- A Birnbaum-importance based genetic local search algorithm for component assignment problems (Q2449396) (← links)
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem (Q2629594) (← links)
- Integrated multi-project planning and scheduling -- a multiagent approach (Q2672092) (← links)
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting (Q2798120) (← links)
- Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art (Q3432703) (← links)
- Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms (Q5143361) (← links)
- First Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project Structure (Q5171825) (← links)
- An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains (Q5244304) (← links)
- A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem (Q5246811) (← links)
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic (Q6088236) (← links)
- A clustering‐based review on project portfolio optimization methods (Q6092507) (← links)
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem (Q6106590) (← links)