Pages that link to "Item:Q5948793"
From MaRDI portal
The following pages link to The economic lot scheduling problem under power-of-two policy (Q5948793):
Displaying 12 items.
- Quasi-fixed cyclic production schemes for multiple products with stochastic demand (Q322851) (← links)
- An exact algorithm for solving the economic lot and supply scheduling problem using a power-of-two policy (Q337106) (← links)
- A heuristic approach for determining lot sizes and schedules using power-of-two policy (Q933870) (← links)
- The economic lot scheduling problem under extended basic period and power-of-two policy (Q968005) (← links)
- The economic lot scheduling problem without capacity constraints (Q1772974) (← links)
- A profit-maximizing economic lot scheduling problem with price optimization (Q2384842) (← links)
- Determination of replenishment dates for restricted-storage, static demand, cyclic replenishment schedule (Q2482372) (← links)
- Single item lot sizing problems (Q2566041) (← links)
- Economic lot scheduling problems incorporating a cost of using the production facility (Q3055413) (← links)
- A genetic algorithm for solving the economic lot scheduling problem in flow shops (Q3518466) (← links)
- Cyclic lot scheduling with sequence-dependent set-ups: a heuristic for disassembly processes (Q4671384) (← links)
- New search algorithm for solving the maintenance scheduling problem for a family of machines (Q5475285) (← links)