Pages that link to "Item:Q5955079"
From MaRDI portal
The following pages link to Single-machine scheduling with maintenance and repair rate-modifying activities (Q5955079):
Displaying 27 items.
- Scheduling a deteriorating maintenance activity and due-window assignment (Q337476) (← links)
- Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time (Q433105) (← links)
- Unrelated parallel-machine scheduling problems with aging effects and deteriorating maintenance activities (Q497936) (← links)
- Parallel machine scheduling with a deteriorating maintenance activity and total absolute differences penalties (Q548379) (← links)
- A single machine scheduling problem with availability constraints and sequence-dependent setup costs (Q552454) (← links)
- Scheduling problems with a weight-modifying-activity (Q828829) (← links)
- Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns (Q829166) (← links)
- A note on worst-case performance of heuristics for maintenance scheduling problems (Q868400) (← links)
- Considering scheduling and preventive maintenance in the flowshop sequencing problem (Q883296) (← links)
- Prioritized surgery scheduling in face of surgeon tiredness and fixed off-duty period (Q887888) (← links)
- Two-parallel machines scheduling with rate-modifying activities to minimize total completion time (Q1027640) (← links)
- A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration (Q1037697) (← links)
- Parallel-machine scheduling problems with past-sequence-dependent delivery times and aging maintenance (Q1666798) (← links)
- Single machine scheduling with resource allocation and learning effect considering the rate-modifying activity (Q1667833) (← links)
- Optimal rules for single machine scheduling with stochastic breakdowns (Q1717990) (← links)
- Optimal sequence for single server scheduling incorporating a rate-modifying activity under job-dependent linear deterioration (Q2076816) (← links)
- An optimal single-machine scheduling with linear deterioration rate and rate-modifying activities (Q2355981) (← links)
- Simultaneous production and maintenance planning for a single capacitated resource facing both a dynamic demand and intensive wear and tear (Q2358154) (← links)
- Integrated rescheduling and preventive maintenance for arrival of new jobs through evolutionary multi-objective optimization (Q2402113) (← links)
- Single-machine common flow allowance scheduling with job-dependent aging effects and a deteriorating maintenance activity (Q2448206) (← links)
- Single machine scheduling under potential disruption (Q2457274) (← links)
- Evaluation of the expected makespan of a set of non-resumable jobs on parallel machines with stochastic failures (Q2629648) (← links)
- Two-machine flow shop scheduling integrated with preventive maintenance planning (Q2795170) (← links)
- An Optimal Single-Machine Scheduling with Linear Deterioration Rate and Rate-Modifying Activities (Q2867131) (← links)
- Integrated decision-support system for diagnosis, maintenance planning, and scheduling of manufacturing systems (Q3432695) (← links)
- SINGLE MACHINE SCHEDULING WITH FORBIDDEN INTERVALS AND JOB DELIVERY TIMES (Q3526523) (← links)
- SCHEDULING WITH POSITION-BASED DETERIORATING JOBS AND MULTIPLE DETERIORATING RATE-MODIFYING ACTIVITIES (Q5411735) (← links)