The following pages link to Marie-Claude Portmann (Q596445):
Displaying 19 items.
- Maximization problems in single machine scheduling (Q596446) (← links)
- Single machine group scheduling with resource dependent setup and processing times (Q707136) (← links)
- (Q1197645) (redirect page) (← links)
- Some new efficient methods to solve the \(n/1/r_ i/\sum{}T_ i\) scheduling problem (Q1197646) (← links)
- Genetic algorithm for the permutation flow-shop scheduling problem with linear models of operations (Q1273121) (← links)
- Branch and bound crossed with GA to solve hybrid flowshops (Q1296101) (← links)
- Optimal testing and repairing a failed series system (Q2369986) (← links)
- Stability analysis of an optimal balance for an assembly line with fixed cycle time (Q2569066) (← links)
- Permutation flowshop scheduling problems with maximal and minimal time lags (Q2581596) (← links)
- Permutation flow shops with exact time lags to minimise maximum lateness (Q3055251) (← links)
- (Q3354824) (← links)
- Simulation studies in JIT production (Q3356039) (← links)
- (Q3730316) (← links)
- (Q3792472) (← links)
- (Q4313063) (← links)
- (Q4356888) (← links)
- (Q4433440) (← links)
- Evaluating flexible solutions in single machine scheduling via objective function maximization: the study of computational complexity (Q4600609) (← links)
- (Q5702319) (← links)