Pages that link to "Item:Q5966684"
From MaRDI portal
The following pages link to Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment (Q5966684):
Displaying 13 items.
- Optimizing a production system with rework and equal sized batch shipments (Q850297) (← links)
- Production to order on a two machine line with random yields and rigid demand (Q1129928) (← links)
- Single bottleneck systems with proportional expected yields and rigid demand (Q1129931) (← links)
- Optimal yield improvement in multi-stage manufacturing systems (Q1278416) (← links)
- Input control in a batch production system with lead times, due dates and random yields (Q1584793) (← links)
- Optimal procurement and production planning for multi-product multi-stage production under yield uncertainty (Q1713747) (← links)
- Disposal versus rework -- inventory control in a production system with random yield (Q1754221) (← links)
- A two-bottleneck system with binomial yields and rigid demand (Q1776968) (← links)
- Reducing the cost of defects in multistage production systems: A budget allocation perspective (Q1869497) (← links)
- Lot sizing with random yields and tardiness costs (Q1974281) (← links)
- Optimal batch sizing in a multi-stage production system with rework consideration (Q2384844) (← links)
- Lot-sizing two-echelon assembly systems with random yields and rigid demand (Q2496081) (← links)
- Serial production systems with random yield and rigid demand: a heuristic (Q2643803) (← links)