Pages that link to "Item:Q600846"
From MaRDI portal
The following pages link to Parallel batch scheduling of equal-length jobs with release and due dates (Q600846):
Displaying 8 items.
- The lockmaster's problem (Q322695) (← links)
- A model for minimizing active processor time (Q487001) (← links)
- Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility (Q490371) (← links)
- Single machine scheduling with multiple common due date assignment and aging effect under a deteriorating maintenance activity consideration (Q741381) (← links)
- Theoretical expectation versus practical performance of Jackson's heuristic (Q1665791) (← links)
- Just-in-time logistics for far-distant suppliers: scheduling truck departures from an intermediate cross-docking terminal (Q1703454) (← links)
- Solving a supply chain scheduling problem with non-identical job sizes and release times by applying a novel effective heuristic algorithm (Q2795178) (← links)
- Scheduling a proportionate flow shop of batching machines (Q5919041) (← links)