Pages that link to "Item:Q617517"
From MaRDI portal
The following pages link to A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times (Q617517):
Displaying 9 items.
- Optimal \(K\)-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times (Q282247) (← links)
- Robust optimization for the cyclic hoist scheduling problem (Q300031) (← links)
- Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance (Q337088) (← links)
- Cyclic robot scheduling for 3D printer-based flexible assembly systems (Q829186) (← links)
- A hybrid metaheuristic algorithm to optimise a real-world robotic cell (Q1652331) (← links)
- An efficient bicriteria algorithm for stable robotic flow shop scheduling (Q1753515) (← links)
- Grouping tasks to save energy in a cyclic scheduling problem: a complexity study (Q2178065) (← links)
- Joint production and transportation scheduling in flexible manufacturing systems (Q2274861) (← links)
- Complexity of scheduling problem in single-machine flexible manufacturing system with cyclic transportation and unlimited buffers (Q2412847) (← links)