The following pages link to Subir Bhattacharya (Q689625):
Displaying 8 items.
- A faster alternative to \(SSS^*\) with extension to variable memory (Q689627) (← links)
- Mathematical model for scheduling operations in cascaded continuous processing units (Q879276) (← links)
- A two pass heuristic algorithm for scheduling `blocked out' units in continuous process industry (Q940895) (← links)
- Integrated inventory model for similar products under a two-echelon supply chain environment: an empirical study (Q998715) (← links)
- An exact depth-first algorithm for the pallet loading problem (Q1303552) (← links)
- A general framework for minimax search in game trees (Q1342257) (← links)
- The multiple resource constrained project scheduling problem: A breadth-first approach (Q1806916) (← links)
- `Buy online and pick up in-store': implications for the store inventory (Q2240031) (← links)