The following pages link to Masao Yokoyama (Q706969):
Displaying 5 items.
- Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times (Q706971) (← links)
- Optimization of the stochastic dynamic production cycling problem by a genetic algorithm. (Q1413842) (← links)
- Scheduling for two-stage production system with setup and assembly operations (Q1879793) (← links)
- Flow-shop scheduling with setup and assembly operations (Q2467263) (← links)
- (Q3958371) (← links)