The following pages link to Neng-Hui Shih (Q724380):
Displaying 12 items.
- The effects of inspection delay and restoration cost on the optimal inspection and production policy (Q724381) (← links)
- Utilizing the information theory of entropy to solve an off-line inspection problem (Q766257) (← links)
- The sensitivity analysis of binary networks via simulation (Q1124722) (← links)
- Determining an optimal production run length with an extended quality control policy for an imperfect process (Q2289291) (← links)
- Correlation-inducing variance reduction in regenerative simulation (Q2564236) (← links)
- A conditional simulation method for estimating the critical component of networks (Q4392582) (← links)
- Impact of inspection errors on the lot size problem (Q4678406) (← links)
- On the identification problem for bilinear time series models (Q4857319) (← links)
- Estimating simulation metamodels using correlated control variates (Q4861312) (← links)
- The effect of full or partial pricing integration on supply chain management (Q5214332) (← links)
- The model identification of beta distribution based on quantiles (Q5220844) (← links)
- Estimating completion-time distribution in stochastic activity networks (Q5464246) (← links)