The following pages link to Seyyed Mohammad Taghi Fatemi Ghomi (Q733534):
Displaying 50 items.
- (Q256643) (redirect page) (← links)
- Acceleration strategies of Benders decomposition for the security constraints power system expansion planning (Q256646) (← links)
- Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times (Q340332) (← links)
- Integrated markdown pricing and aggregate production planning in a two echelon supply chain: a hybrid fuzzy multiple objective approach (Q345485) (← links)
- A new hybrid algorithm of scatter search and Nelder-Mead algorithms to optimize joint economic lot sizing problem (Q495077) (← links)
- Hybrid flowshop scheduling with machine and resource-dependent processing times (Q534872) (← links)
- Scheduling open shops with parallel machines to minimize total completion time (Q609214) (← links)
- Bi-criteria assembly line balancing by considering flexible operation times (Q651766) (← links)
- A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain (Q662246) (← links)
- Group shops scheduling with makespan criterion subject to random release dates and processing times (Q733535) (← links)
- A contribution and new heuristics for open shop scheduling (Q733548) (← links)
- Minimal covering unrestricted location of obnoxious facilities: bi-objective formulation and a case study (Q832797) (← links)
- An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times (Q850231) (← links)
- A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept (Q852940) (← links)
- Developing a heuristic algorithm for order production planning using network models under uncertainty conditions (Q858779) (← links)
- Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines (Q878937) (← links)
- Earliness tardiness production planning and scheduling in flexible flowshop systems under finite planning horizon (Q879577) (← links)
- Fuzzy hypothesis testing with vague data using likelihood ratio test (Q889920) (← links)
- Applying FARSJUM intelligent system to derive priorities in sparse hierarchical problems (Q891200) (← links)
- A note on minimizing makespan on a single batch processing machine with nonidentical job sizes (Q1029348) (← links)
- A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network (Q1124724) (← links)
- Order acceptance and due-date quotation in low machine rates (Q1630128) (← links)
- Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates (Q1630186) (← links)
- Effect of two-echelon trade credit on pricing-inventory policy of non-instantaneous deteriorating products with probabilistic demand and deterioration functions (Q1699169) (← links)
- A game-theoretic model to analyze value creation with simultaneous cooperation and competition of supply chain partners (Q1719086) (← links)
- Pricing and inventory control in a supply chain of deteriorating items: a non-cooperative strategy with probabilistic parameters (Q1791847) (← links)
- Path critical index and activity critical index in PERT networks (Q1848623) (← links)
- A new structural mechanism for reducibility of stochastic PERT networks (Q1869478) (← links)
- Optimal control of service rates and arrivals in Jackson networks (Q1869527) (← links)
- Two-machine flow shop total tardiness scheduling problem with deteriorating jobs (Q1930748) (← links)
- Solving an integrated cell formation and group layout problem using a simulated annealing enhanced by linear programming (Q2156474) (← links)
- Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs (Q2257346) (← links)
- Stochastic mixed-model assembly line sequencing problem: mathematical modeling and Q-learning based simulated annealing hyper-heuristics (Q2282543) (← links)
- Application of the preventive maintenance scheduling to increase the equipment reliability: case study- bag filters in cement factory (Q2338471) (← links)
- Realistic two-stage flowshop batch scheduling problems with transportation capacity and times (Q2428924) (← links)
- A possibilistic multiple objective pricing and lot-sizing model with multiple demand classes (Q2446356) (← links)
- Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness (Q2450493) (← links)
- Lower bound for the mean project completion time in dynamic PERT networks (Q2462112) (← links)
- A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains (Q2491781) (← links)
- The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine (Q2510555) (← links)
- (Q2791998) (← links)
- A hybrid credibility-based fuzzy multiple objective optimisation to differential pricing and inventory policies with arbitrage consideration (Q2792199) (← links)
- Fuzzy development of Mean and Range control charts using statistical properties of different representative values (Q2938831) (← links)
- A study on open shop scheduling to minimise total tardiness (Q2967576) (← links)
- Scheduling job shop problems with sequence-dependent setup times (Q3055268) (← links)
- Grouping in decomposition method for multi-item capacitated lot-sizing problem with immediate lost sales and joint and item-dependent setup cost (Q3082694) (← links)
- (Q3149922) (← links)
- (Q3149923) (← links)
- (Q3149924) (← links)
- (Q3149926) (← links)