The following pages link to Ming-Hung Shu (Q745510):
Displaying 31 items.
- Generalized confidence intervals for the process capability index \(C_{pm}\) (Q745511) (← links)
- Impacts of transportation cost on distribution-free newsboy problems (Q1718093) (← links)
- A production-delivery lot sizing policy with stochastic delivery time and in consideration of transportation cost (Q2010062) (← links)
- Fuzzy \(\overline{x}\) and \(s\) control charts: a data-adaptability and human-acceptance approach (Q2012871) (← links)
- Variables skip-lot sampling plans on the basis of process capability index for products with a low fraction of defectives (Q2032232) (← links)
- A variables-type multiple-dependent-state sampling plan based on the lifetime performance index under a Weibull distribution (Q2115823) (← links)
- Variable-sampling plans based on lifetime-performance index under exponential distribution with censoring and its extensions (Q2295125) (← links)
- The fuzzy \(u\)-chart for sustainable manufacturing in the Vietnam textile dyeing industry (Q2333529) (← links)
- Fuzzy inference to assess manufacturing process capability with imprecise data (Q2462158) (← links)
- Supplier Evaluation and Selection Based on Stochastic Dominance: A Quality-Based Approach (Q2921843) (← links)
- Dynamic performance and cost measures with setup determination under state-age-dependent deterioration (Q3063821) (← links)
- Dynamic performance measures for tools with multi-state wear processes and their applications for tool design and selection (Q3163376) (← links)
- Measuring the manufacturing process yield based on fuzzy data (Q3163693) (← links)
- A comparison of methods forsing loss-based capability index (Q3401366) (← links)
- Capital investment in setup cost reduction for a lot-size, reorder point model (Q3429074) (← links)
- Demerit-Fuzzy Rating Mechanism and Monitoring Chart (Q3449286) (← links)
- Testing process capability based on<i>C<sub>pm</sub></i>in the presence of random measurement errors (Q3592053) (← links)
- A comparative study of the monitoring performance for weighted control charts (Q3643050) (← links)
- Erlang sampling of an alternating poisson process (Q4337192) (← links)
- Lower confidence bounds with sample size information for <i>C<sub>pm</sub> </i> applied to production yield assurance (Q4474692) (← links)
- (Q4661820) (← links)
- Lower confidence bounds for <i>C</i> <sub>PU</sub> and <i>C</i> <sub>PL</sub> based on multiple samples with application to production yield assurance (Q4671260) (← links)
- Standardized lifetime-capability and warranty-return-rate-based suppliers qualification and selection with accelerated Weibull-life type II testing data (Q5046807) (← links)
- A Bayesian Procedure for Assessing Process Performance Based on Expected Relative Loss with Asymmetric Tolerances (Q5123346) (← links)
- Monitoring imprecise fraction of nonconforming items using<i>p</i>control charts (Q5123613) (← links)
- A two-phase method for controlling Erlang-failure processes with high reliability (Q5124798) (← links)
- The effect of full or partial pricing integration on supply chain management (Q5214332) (← links)
- Some Scheduling Problems on a Single Machine with General Job Effects of Position-Dependent Learning and Start-Time-Dependent Deterioration (Q5255178) (← links)
- Evaluating lifetime performance for the Pareto model with censored and imprecise information (Q5300717) (← links)
- Sample size determination for estimating process precision and process loss based on multiple samples with designated accuracy ratio (Q5696455) (← links)
- Quick-switch inspection scheme based on the overall process capability index for modern industrial web-based processing environment (Q6580745) (← links)