The following pages link to Avraham Shtub (Q835551):
Displaying 16 items.
- Resource allocation in stochastic, finite-capacity, multi-project systems through the cross entropy methodology (Q835552) (← links)
- Model for cost estimation in a finite-capacity stochastic environment based on shop floor optimization combined with simulation (Q953458) (← links)
- A cost minimization procedure for mixed model production lines with normally distributed task times (Q1068704) (← links)
- Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm (Q1266571) (← links)
- Optimal segmentation of projects -- Schedule and cost considerations (Q1278387) (← links)
- Scheduling projects to maximize net present value -- the case of time-dependent, contingent cash flows (Q1278462) (← links)
- Capacity planning by the dynamic multi-resource generalized assignment problem (DMRGAP) (Q1291708) (← links)
- Scheduling projects with variable-intensity activities: The case of dynamic earliness and tardiness costs (Q1307810) (← links)
- Determination of reorder points for spare parts in a two-echelon inventory system: The case of non identical maintenance facilities (Q1328633) (← links)
- DGAP -- The dynamic generalized assignment problem (Q1357783) (← links)
- Formulating and solving production planning problems (Q1806882) (← links)
- Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology (Q2485933) (← links)
- Constructing and evaluating balanced portfolios of R\&D projects with interactions: a DEA based methodology (Q2488923) (← links)
- Dimensions of manufacturing automation (Q3030566) (← links)
- An integrated layout for group technology with in-process inventory costs (Q3329198) (← links)
- The stochastic time–cost tradeoff problem: A robust optimization approach (Q3428916) (← links)