Pages that link to "Item:Q835581"
From MaRDI portal
The following pages link to A multi-criteria approach for scheduling semiconductor wafer fabrication facilities (Q835581):
Displayed 4 items.
- A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival (Q991390) (← links)
- Rule-based scheduling in wafer fabrication with due date-based objectives (Q1761232) (← links)
- Dynamic supply chain scheduling (Q2434280) (← links)
- A FUZZY-NEURAL FLUCTUATION SMOOTHING RULE FOR SCHEDULING JOBS WITH VARIOUS PRIORITIES IN A SEMICONDUCTOR MANUFACTURING FACTORY (Q5324319) (← links)