Pages that link to "Item:Q858340"
From MaRDI portal
The following pages link to Modelling complex assemblies as a queueing network for lead time control (Q858340):
Displaying 4 items.
- Part sojourn time distribution in a two-machine line (Q320643) (← links)
- Longest path analysis in networks of queues: dynamic scheduling problems (Q858339) (← links)
- A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms (Q869182) (← links)
- Due date assignment for multistage assembly systems (Q1024730) (← links)