Pages that link to "Item:Q872122"
From MaRDI portal
The following pages link to A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing (Q872122):
Displaying 8 items.
- An exact scalarization method with multiple reference points for bi-objective integer linear optimization problems (Q828841) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- Energy aware scheduling in flexible flow shops with hybrid particle swarm optimization (Q2664442) (← links)
- Multi-objective due-date setting in a make-to-order environment (Q3055252) (← links)
- Monolithic versus hierarchical approach to integrated scheduling in a supply chain (Q3055263) (← links)
- Mixed Integer Programming Approaches to Planning and Scheduling in Electronics Supply Chains (Q5162163) (← links)
- A multi‐objective customer orders assignment and resource leveling in make‐to‐order manufacturing (Q5438563) (← links)
- A lexicographic optimization approach for a bi-objective parallel-machine scheduling problem minimizing total quality loss and total tardiness (Q6164626) (← links)