The following pages link to Yih-Long Chang (Q875401):
Displaying 15 items.
- An evaluation of lot-sizing heuristics for deteriorating inventory in material requirements planning systems (Q875402) (← links)
- Efficient algorithm for additive and multiplicative models in data envelopment analysis (Q1119139) (← links)
- Minimizing the number of tardy jobs for \(m\) parallel machines (Q1127174) (← links)
- A new heuristic for the n-job, M-machine flow-shop problem (Q2277356) (← links)
- A scatter search approach to sequence-dependent setup times job shop scheduling (Q3055324) (← links)
- (Q3354676) (← links)
- Two modifications of the least cost per period heuristic for dynamic lot-sizing (Q3409576) (← links)
- (Q3479795) (← links)
- Minimizing mean absolute deviation of completion times about a common due date (Q3735428) (← links)
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date (Q3777790) (← links)
- Minimizing absolute and squared deviations of completion times with different earliness and tardiness penalties and a common due date (Q3806975) (← links)
- (Q3988847) (← links)
- (Q4032031) (← links)
- Cell formation in group technology: A combinatorial search approach (Q4245306) (← links)
- Heuristics for minimizing mean tardiness form parallel machines (Q5202825) (← links)