Pages that link to "Item:Q879286"
From MaRDI portal
The following pages link to A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times (Q879286):
Displaying 23 items.
- Minimizing the total completion time in a distributed two stage assembly system with setup times (Q337027) (← links)
- A particle swarm optimization approach with refinement procedure for nurse rostering problem (Q337337) (← links)
- Flexible open shop scheduling problem to minimize makespan (Q342284) (← links)
- Differential evolution algorithm with separated groups for multi-dimensional optimization problems (Q421703) (← links)
- Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop (Q602916) (← links)
- Cyclic robot scheduling for 3D printer-based flexible assembly systems (Q829186) (← links)
- Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan (Q1010280) (← links)
- The two-stage assembly scheduling problem to minimize total completion time with setup times (Q1017445) (← links)
- Evolutionary algorithm-based learning of fuzzy neural networks. II: Recurrent fuzzy neural networks (Q1040934) (← links)
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures (Q1622791) (← links)
- The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic (Q1651546) (← links)
- Two-stage assembly scheduling with batch setup times, time-dependent deterioration, and preventive maintenance activities using meta-heuristic algorithms (Q1721321) (← links)
- Minimizing the makespan for a two-stage three-machine assembly flow shop problem with the sum-of-processing-time based learning effect (Q1727266) (← links)
- A two-stage assembly-type flowshop scheduling problem for minimizing total tardiness (Q1793450) (← links)
- Fuzzy self-tuning differential evolution for optimal product line design (Q2024008) (← links)
- Two-stage three-machine assembly scheduling problem with sum-of-processing-times-based learning effect (Q2152905) (← links)
- Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system (Q2286964) (← links)
- Two-stage assembly scheduling problem for minimizing total tardiness with setup times (Q2293429) (← links)
- The two-machine flowshop scheduling problem with sequence-independent setup times: new lower bounding strategies (Q2356207) (← links)
- Improved differential evolution approach based on cultural algorithm and diversity measure applied to solve economic load dispatch problems (Q2390414) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time (Q2629637) (← links)
- Lot streaming for a two-stage assembly system in the presence of handling costs (Q6136078) (← links)