Pages that link to "Item:Q880579"
From MaRDI portal
The following pages link to Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication (Q880579):
Displayed 12 items.
- A bi-objective approach for scheduling ground-handling vehicles in airports (Q342334) (← links)
- Jackson's semi-preemptive scheduling on a single machine (Q991363) (← links)
- A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival (Q991390) (← links)
- Computing lower and upper bounds for a large-scale industrial job shop scheduling problem (Q1011298) (← links)
- A batch-oblivious approach for complex job-shop scheduling problems (Q1695012) (← links)
- Rule-based scheduling in wafer fabrication with due date-based objectives (Q1761232) (← links)
- A survey of scheduling with parallel batch (p-batch) processing (Q2076906) (← links)
- Job scheduling of diffusion furnaces in semiconductor fabrication facilities (Q2140148) (← links)
- Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study (Q3605414) (← links)
- An Improved Branch-and-Bound Algorithm for the One-Machine Scheduling Problem with Delayed Precedence Constraints (Q5085478) (← links)
- An 11/7 — Approximation Algorithm for Single Machine Scheduling Problem with Release and Delivery Times (Q6090764) (← links)
- Scheduling Algorithms for Single Machine Problem with Release and Delivery Times (Q6110178) (← links)