Pages that link to "Item:Q884075"
From MaRDI portal
The following pages link to A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex (Q884075):
Displayed 5 items.
- Models for scheduling charges in continuous casting: application to a Brazilian steel plant (Q276311) (← links)
- A soft-decision based two-layered scheduling approach for uncertain steelmaking-continuous casting process (Q319506) (← links)
- Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm (Q400054) (← links)
- A GRASP heuristic for slab scheduling at continuous casters (Q480761) (← links)
- Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach (Q2356184) (← links)