Pages that link to "Item:Q940876"
From MaRDI portal
The following pages link to Efficient algorithms for machine scheduling problems with earliness and tardiness penalties (Q940876):
Displaying 6 items.
- GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times (Q1945095) (← links)
- Heuristic algorithms to maximize revenue and the number of jobs processed on parallel machines (Q2290308) (← links)
- A unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems (Q2327956) (← links)
- Multi-coloring and job-scheduling with assignment and incompatibility costs (Q2449346) (← links)
- Energy cost efficient scheduling in flexible job-shop manufacturing systems (Q6113446) (← links)
- A reduced variable neighborhood search for the just in time job shop scheduling problem with sequence dependent setup times (Q6568444) (← links)