The following pages link to Milton L. Smith (Q955688):
Displaying 13 items.
- A dynamic heuristic-based algorithm to part input sequencing in flexible manufacturing systems for mass customization capability (Q955689) (← links)
- (Q1310013) (redirect page) (← links)
- A heuristic for the single machine tardiness problem (Q1310015) (← links)
- Review of the ordered and proportionate flow shop scheduling research (Q3120585) (← links)
- (Q3212909) (← links)
- Due Date Assignment for Production Systems (Q3905049) (← links)
- Counterexamples to optimal permutation schedules for certain flow shop problems (Q3912339) (← links)
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem (Q3939582) (← links)
- The Lessons of Flowshop Scheduling Research (Q3991317) (← links)
- Flowshop Sequencing Problem with Ordered Processing Time Matrices (Q4058808) (← links)
- Flowshop sequencing problem with ordered processing time matrices: A general case (Q4103316) (← links)
- Effect of maintenance policies on the just-in-time production system (Q4398928) (← links)
- A Heuristic Algorithm for the <i>n</i> Job, <i>m</i> Machine Sequencing Problem (Q5590535) (← links)