Pages that link to "Item:Q965532"
From MaRDI portal
The following pages link to Utilizing an approximative solution to obtain the real optimal solution for a production and inspection model (Q965532):
Displaying 3 items.
- A particle swarm algorithm for inspection optimization in serial multi-stage processes (Q437923) (← links)
- The effects of inspection delay and restoration cost on the optimal inspection and production policy (Q724381) (← links)
- Determining an optimal production run length with an extended quality control policy for an imperfect process (Q2289291) (← links)