Pages that link to "Item:Q980290"
From MaRDI portal
The following pages link to Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown (Q980290):
Displaying 17 items.
- Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework (Q522439) (← links)
- Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments (Q712650) (← links)
- Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management (Q1630159) (← links)
- On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown (Q1630160) (← links)
- A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering (Q1708531) (← links)
- An economic production quantity model with random yield subject to process compressibility (Q1931078) (← links)
- Optimization of inventory system with defects, rework failure and two types of errors under crisp and fuzzy approach (Q2086914) (← links)
- Imperfect production process with learning and forgetting effects (Q2356170) (← links)
- Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system (Q2397594) (← links)
- Modeling an inventory problem with random supply, inspection and machine breakdown (Q2425020) (← links)
- Analysis of a discrete production workstation (Q2669637) (← links)
- Solving production lot size problem with an improved delivery policy and failure in rework by a simplifi ed solution procedure (Q2903240) (← links)
- Advertisement Policy, Reliability Dependent Imperfect Production and Environmental Pollution Control Problem in Fuzzy-Rough Environment (Q3448625) (← links)
- Revisiting revenue management for remanufactured products (Q5172506) (← links)
- (Q5860412) (← links)
- A two-phase approach for jointly determining the lot size and delivery policy in a vendor-buyer integrated system with rework (Q5891690) (← links)
- Optimal production run in an imperfect production process with maintenance under warranty and product insurance (Q6059843) (← links)