The following pages link to Erkan Topal (Q992720):
Displaying 3 items.
- A new MIP model for mine equipment scheduling by minimizing maintenance cost (Q992721) (← links)
- A new model for open-pit production and waste-dump scheduling (Q5058982) (← links)
- Pattern search method for accelerating Stope boundary optimization problem in underground mining operations (Q6094504) (← links)