Pages that link to "Item:Q992721"
From MaRDI portal
The following pages link to A new MIP model for mine equipment scheduling by minimizing maintenance cost (Q992721):
Displaying 9 items.
- Production-driven opportunistic maintenance for batch production based on MAM-APB scheduling (Q300062) (← links)
- An MILP approach to multi-location, multi-period equipment selection for surface mining with case studies (Q747008) (← links)
- A multiple objective transportation problem approach to dynamic truck dispatching in surface mines (Q1728512) (← links)
- Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions (Q1752139) (← links)
- Optimizing the open pit-to-underground mining transition (Q1752806) (← links)
- Dynamic maintenance decision-making for series-parallel manufacturing system based on MAM-MTW methodology (Q1926842) (← links)
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty (Q1926975) (← links)
- A survey on scheduling problems with due windows (Q2630089) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)