Submodular batch scheduling on parallel machines
From MaRDI portal
Cites work
- A coordination mechanism for a scheduling game with parallel-batching machines
- A survey of scheduling with parallel batch (p-batch) processing
- An analysis of approximations for maximizing submodular set functions—I
- Batch sizing and job sequencing on a single machine
- Batch-processing scheduling with setup times
- Best possible algorithms for online scheduling on identical batch machines with periodic pulse interruptions
- Bounded serial-batching scheduling for minimizing maximum lateness and makespan
- Bounds on Multiprocessing Timing Anomalies
- Efficient Algorithms for Scheduling Semiconductor Burn-In Operations
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- Mixed batch scheduling on identical machines
- ON MINIMIZING TOTAL COMPLETION TIME IN BATCH MACHINE SCHEDULING
- On-line algorithms for minimizing makespan on batch processing machines
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Parallel-batch scheduling with rejection: structural properties and approximation algorithms
- Scheduling a batching machine
- Scheduling a single parallel-batching machine with non-identical job sizes and incompatible job families
- Scheduling Problems with Two Competing Agents
- Scheduling Semiconductor Burn-In Operations to Minimize Total Flowtime
- Single-machine and parallel-machine serial-batching scheduling problems with position-based learning effect and linear setup time
- Single-machine serial-batch delivery scheduling with two competing agents and due date assignment
- Submodular set functions, matroids and the greedy algorithm: Tight worst- case bounds and some generalizations of the Rado-Edmonds theorem
- The complexity of one-machine batching problems
- The single machine serial batch scheduling problem with rejection to minimize total completion time and total rejection cost
- Two-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes
Cited in
(1)
This page was built for publication: Submodular batch scheduling on parallel machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q7028660)