Technical Note—The EOQ Model under Stochastic Lead Time
From MaRDI portal
Cited in
(19)- Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm
- Balancing stocks and backlogs with stochastic lead times. A special case
- Lead-time variability reduction in stochastic inventory models
- Random lead times and expedited orders in \((Q,r)\) inventory systems
- The impact of supply chain visibility when lead time is random
- A new approach to economic production quantity problems with fuzzy parameters and inventory constraint
- Optimal lot-sizing policy for a failure prone production system with investment in process quality improvement and lead time variance reduction
- The effect of lead-time on the supply chain: the mean versus the variance
- A mirror-image lead time inventory model
- A Comment on and Correction to the Holding Cost Expression in the Determination of Safety Stock
- Optimal supply planning in MRP environments for assembly systems with random component procurement times
- Setup cost reduction in an inventory model with finite-range stochastic lead times
- Analysis of production and inventory systems when orders may cross over
- On a stochastic extension of the EOQ formula
- Optimal ordering policies with convertible lead times
- Investing in lead-time variability reduction in a quality-adjusted inventory model with finite-range stochastic lead-time
- An analytical solution to a fuzzy economic order quantity problem
- Fuzzy economic order time models with random demand
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
This page was built for publication: Technical Note—The EOQ Model under Stochastic Lead Time
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4177280)