The optimum reject allowance problem
From MaRDI portal
Cited in
(8)- Multi-period production control in a centralized fully flexible manufacturing system
- Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
- Control policy for a manufacturing system with random yield and rework
- Using fuzzy analytic hierarchy process and particle swarm optimisation for balanced and defective supply chain problems considering WEEE/RoHS directives
- Über ein dynamisches Programmierungsverfahren zur Kostenminimalisierung bei vorgegebenen Auftragsstückzahlen
- Determining optimum reject allowances for deteriorating production systems
- Die Minimisierung sinnloser Größen
- Exact time-discounting and heuristics for the EOQ model with random yield
This page was built for publication: The optimum reject allowance problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2769006)