Multi-period production control in a centralized fully flexible manufacturing system
From MaRDI portal
Publication:1197922
DOI10.1016/0377-2217(92)90296-LzbMath0761.90052MaRDI QIDQ1197922
Publication date: 16 January 1993
Published in: European Journal of Operational Research (Search for Journal in Brave)
centralized fully flexible manufacturing system; dynamic optimal dispatching; multi-period production control
Cites Work
- Unnamed Item
- Unnamed Item
- Dynamic programming and stochastic control
- The Optimum Reject Allowance Problem
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Batch Size and Stocking Levels in Multi-Echelon Repairable Systems
- Production Control in Multistage Systems with Variable Yield Losses
- Optimal Dispatching in a Periodic Review Cellular Manufacturing System
- Contraction Mappings in the Theory Underlying Dynamic Programming
- Bayes Markovian Decision Models for a Multiperiod Reject Allowance Problem