Two-Machine Super-Shop Scheduling Problem
From MaRDI portal
Recommendations
Cited in
(10)- Scheduling two jobs with fixed and nonfixed routes
- Complexity of mixed shop scheduling problems: A survey
- Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches
- Approximation algorithms for the three-machine proportionate mixed shop scheduling
- Two-machine open-shop scheduling with rejection to minimize the makespan
- A polynomial-time algorithm for the preemptive mixed-shop problem with two unit operations per job
- The three-machine proportionate open shop and mixed shop minimum makespan problems
- A new three-machine shop scheduling: complexity and approximation algorithm
- METAHEURISTICS FOR THE MIXED SHOP SCHEDULING PROBLEM
- Isomorphic scheduling problems
This page was built for publication: Two-Machine Super-Shop Scheduling Problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3978740)