Two-agent scheduling to minimize makespan and total completion time on a serial-batching machine
From MaRDI portal
Recommendations
- Two-agent scheduling on an unbounded serial batching machine
- Serial-batching scheduling with two agents to minimize makespan and maximum cost
- Two-agent scheduling on a bounded series-batch machine to minimize makespan and maximum cost
- Improved algorithms for two-agent scheduling on an unbounded serial-batching machine
- Two-agent scheduling with agent specific batches on an unbounded serial batching machine
Cited in
(9)- A note on two-agent scheduling on an unbounded parallel-batching machine with makespan and maximum lateness objectives
- Two-agent scheduling on a bounded series-batch machine to minimize makespan and maximum cost
- Serial-batching scheduling with two agents to minimize makespan and maximum cost
- Improved algorithms for two-agent scheduling on an unbounded serial-batching machine
- Two-agent scheduling on an unbounded serial batching machine
- Single machine batch scheduling with two competing agents to minimize total flowtime
- Two-agent scheduling on a single sequential and compatible batching machine
- Competitive two-agent scheduling problems to minimize the weighted combination of makespans in a two-machine open shop
- Two-agent scheduling with agent specific batches on an unbounded serial batching machine
This page was built for publication: Two-agent scheduling to minimize makespan and total completion time on a serial-batching machine
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5142948)