An integrated cost model for production scheduling and perfect maintenance (Q553937): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Import240304020342 (talk | contribs)
Set profile property.
 
(4 intermediate revisions by 3 users not shown)
Property / author
 
Property / author: Md. Abdur Rahim / rank
Normal rank
 
Property / author
 
Property / author: Md. Abdur Rahim / rank
 
Normal rank
Property / review text
 
Summary: Production scheduling deals with scheduling production jobs on a machine (single or multiple) in order to optimise a specific objective such as total weighted completion times or total weighted tardiness. The assumption that machines are always available for processing jobs is generally used in the production scheduling literature. In reality, machines often are unavailable due to preventive maintenance activities or machine failure. Production scheduling and preventive maintenance planning are interrelated, but are most often treated separately. This interdependency seems to be overlooked in the literature. This work integrates, simultaneously, the decisions of preventive maintenance and job order sequencing for a single machine. The objective is to find the job order sequence and maintenance decisions that would minimise the expected cost.
Property / review text: Summary: Production scheduling deals with scheduling production jobs on a machine (single or multiple) in order to optimise a specific objective such as total weighted completion times or total weighted tardiness. The assumption that machines are always available for processing jobs is generally used in the production scheduling literature. In reality, machines often are unavailable due to preventive maintenance activities or machine failure. Production scheduling and preventive maintenance planning are interrelated, but are most often treated separately. This interdependency seems to be overlooked in the literature. This work integrates, simultaneously, the decisions of preventive maintenance and job order sequencing for a single machine. The objective is to find the job order sequence and maintenance decisions that would minimise the expected cost. / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B35 / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B25 / rank
 
Normal rank
Property / zbMATH DE Number
 
Property / zbMATH DE Number: 5933713 / rank
 
Normal rank
Property / zbMATH Keywords
 
production scheduling
Property / zbMATH Keywords: production scheduling / rank
 
Normal rank
Property / zbMATH Keywords
 
preventive maintenance
Property / zbMATH Keywords: preventive maintenance / rank
 
Normal rank
Property / zbMATH Keywords
 
deteriorating production processes
Property / zbMATH Keywords: deteriorating production processes / rank
 
Normal rank
Property / zbMATH Keywords
 
integrated models
Property / zbMATH Keywords: integrated models / rank
 
Normal rank
Property / zbMATH Keywords
 
unreliable machine
Property / zbMATH Keywords: unreliable machine / rank
 
Normal rank
Property / zbMATH Keywords
 
cost models
Property / zbMATH Keywords: cost models / rank
 
Normal rank
Property / zbMATH Keywords
 
job sequencing
Property / zbMATH Keywords: job sequencing / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 01:37, 5 March 2024

scientific article
Language Label Description Also known as
English
An integrated cost model for production scheduling and perfect maintenance
scientific article

    Statements

    An integrated cost model for production scheduling and perfect maintenance (English)
    0 references
    0 references
    0 references
    0 references
    28 July 2011
    0 references
    Summary: Production scheduling deals with scheduling production jobs on a machine (single or multiple) in order to optimise a specific objective such as total weighted completion times or total weighted tardiness. The assumption that machines are always available for processing jobs is generally used in the production scheduling literature. In reality, machines often are unavailable due to preventive maintenance activities or machine failure. Production scheduling and preventive maintenance planning are interrelated, but are most often treated separately. This interdependency seems to be overlooked in the literature. This work integrates, simultaneously, the decisions of preventive maintenance and job order sequencing for a single machine. The objective is to find the job order sequence and maintenance decisions that would minimise the expected cost.
    0 references
    0 references
    production scheduling
    0 references
    preventive maintenance
    0 references
    deteriorating production processes
    0 references
    integrated models
    0 references
    unreliable machine
    0 references
    cost models
    0 references
    job sequencing
    0 references