EBQ for a multistage production system considering rework (Q1107427): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Import240304020342 (talk | contribs)
Set profile property.
 
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank

Latest revision as of 03:13, 5 March 2024

scientific article
Language Label Description Also known as
English
EBQ for a multistage production system considering rework
scientific article

    Statements

    EBQ for a multistage production system considering rework (English)
    0 references
    0 references
    1988
    0 references
    Models have been developed to determine (a) the optimum number of cycles for rework and (b) the optimum batch quantity in a multistage production system in which rework is done at the same stage of production where it occurs. Two different policies of processing reworked lots are examined and a comparison is made considering the effect of change of each of the model parameters. Interpretations of the findings together with the resultant guidelines are also provided.
    0 references
    0 references
    optimum number of cycles for rework
    0 references
    optimum batch quantity
    0 references
    multistage production system
    0 references