A note on optimal assignment of slack due-dates in single-machine scheduling (Q1310016): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(4 intermediate revisions by 3 users not shown)
Property / author
 
Property / author: Valery S. Gordon / rank
Normal rank
 
Property / reviewed by
 
Property / reviewed by: Helmut G. Kahlbacher / rank
Normal rank
 
Property / author
 
Property / author: Valery S. Gordon / rank
 
Normal rank
Property / reviewed by
 
Property / reviewed by: Helmut G. Kahlbacher / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal assignment of slack due-date and sequencing in a single machine shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3885495 / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the Assignment of Optimal Due Dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing with Earliness and Tardiness Penalties: A Review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal due-date assignment and sequencing in a single machine shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal assignment of slack due-dates and sequencing in a single-machine shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Survey of scheduling research involving due date determination decisions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3670910 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Due Date Assignment for Production Systems / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 11:07, 22 May 2024

scientific article
Language Label Description Also known as
English
A note on optimal assignment of slack due-dates in single-machine scheduling
scientific article

    Statements

    A note on optimal assignment of slack due-dates in single-machine scheduling (English)
    0 references
    20 December 1993
    0 references
    The author solves a single machine problem with job ready times, special due dates and job preemption allowed. Additionally, job precedence constraints are given. The objective is to minimize a linear combination of the maximum tardiness and due date assignment costs. As due dates the slack due dates are used which allow constant slack for all jobs, i.e. \(d_ j= r_ j+ k\) for all jobs \(j\), \(d_ j\) and \(r_ j\) denote the job due date and ready time, respectively, and the parameter \(k\) is the constant slack for all jobs. The solution consists of two phases, computing the optimal job sequence first, then optimizing the due date parameter \(k\). For arbitrary precedence constraints, the algorithm works in \(O(n^ 2)\), whereas for tree-like precedence constraints the complexity decreases to \(O(n\log n)\). For special cases (if the job due dates and modified job release times are similarly ordered) the proposed algorithm can even be used if job preemption is not allowed.
    0 references
    single machine
    0 references
    job ready times
    0 references
    due dates
    0 references
    job preemption
    0 references
    precedence constraints
    0 references
    maximum tardiness
    0 references
    0 references

    Identifiers