| Property / cites work |
| | |
| Property / cites work: Bi-objective resource-constrained project scheduling with robustness and makespan criteria / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Project scheduling under time dependent costs -- a branch and bound algorithm / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: DAGEN: A generator of testsets for project activity nets / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Network decomposition-based benchmark results for the discrete time-cost tradeoff problem / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A scatter search algorithm for project scheduling under partially renewable resources / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: GRASP and path relinking for project scheduling under partially renewable resources / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Pre-emption in resource-constrained project scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Optimal resource leveling using non-serial dynamic programming / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Satisfiability tests and time-bound adjustments for cumulative scheduling problems / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A double genetic algorithm for the MRCPSP/max / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Scheduling tests in automotive R\&D projects / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Q3468865 / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Heuristics for multimode scheduling problems with dedicated resources / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Scheduling subject to resource constraints: Classification and complexity / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Handbook on Scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Project Scheduling Under Partially Renewable Resource Constraints / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Two approaches to the problem of sharing delay costs in joint projects / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A random generator of resource-constrained multi-project network problems / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Scheduling and constraint propagation / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Q2779816 / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Resource-constrained project scheduling: Notation, classification, models, and methods / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Scheduling projects with labor constraints / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A constraint-based method for project scheduling with time windows / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Project selection, scheduling and resource allocation with time dependent returns / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A \(0-1\) goal programming model for scheduling multiple maintenance projects at a copper mine / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A market-based multi-agent system model for decentralized multi-project scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Linear programming based algorithms for preemptive and non-preemptive RCPSP / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Resource constrained project scheduling with multiple objectives: a decision support approach / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Project Contracts and Payment Schedules: The Client's Problem / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: On modelling payments in projects / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: The multi-mode resource-constrained project scheduling problem with generalized precedence relations / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Modelling setup times, process batches and transfer batches using activity network logic / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: New computational results on the discrete time/cost trade-off problem in project networks / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Rangen: A random network generator for activity-on-the-node networks / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Constraint propagation techniques for the disjunctive scheduling problem / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Optimization guided lower and upper bounds for the resource investment problem / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Distribution requirements and compactness constraints in school timetabling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: ProGen/\(\pi x\) -- An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Q4166568 / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: The resource constrained project scheduling problem with multiple crashable modes: An exact solution method / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Scheduling projects to maximize net present value -- the case of time-dependent, contingent cash flows / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Project scheduling with calendars / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A genetic algorithm for the resource constrained multi-project scheduling problem / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: The course scheduling problem at Lufthansa technical training / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Interactive analysis of multiple-criteria project scheduling problems / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Packing problems and project scheduling models: an integrating perspective / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Project scheduling with multiple modes: A genetic algorithm / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Project scheduling under limited resources. Models, methods, and applications / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Resource-constrained project scheduling: A heuristic for the multi-mode case / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Scheduling and staffing multiple projects with a multi-skilled workforce / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Project scheduling under uncertainty: survey and research potentials / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Project network models with discounted cash flows a guided tour through recent developments / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Resource-constrained project scheduling: A survey of recent developments. / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Solving the resource constrained project scheduling problem with optimization subroutine library / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Ensuring quality in resource constrained project scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Perspectives in modern project scheduling. / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Solving the discrete-continuous project scheduling problem via its discretization / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Simulated annealing for multi-mode resource-constrained project scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Maximizing the net present value of a project under resource constraints using a Lagrangian relaxation based heuristic with tight upper bounds / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A branch-and-cut algorithm for scheduling of projects with variable-intensity activities / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Q3426431 / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Project scheduling with time-varying resource constraints / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Scattered branch and bound. An adaptive search strategy applied to resource-constrained project scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Experimental investigation of heuristics for resource-constrained project scheduling: an update / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Q3426440 / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: PSPLIB -- a project scheduling problem library / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Managing and modelling general resource transfers in (multi-)project scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Multi-Project Scheduling: Categorization of Heuristic Rules Performance / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A multicriteria heuristic method to improve resource allocation in multiproject scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: The project scheduling problem with irregular starting time costs / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: On project scheduling with irregular starting time costs / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Solving Project Scheduling Problems by Minimum Cut Computations / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A genetic algorithm for resource investment problem with discounted cash flows / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: The multiple resource constrained project scheduling problem: A breadth-first approach / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Stochastic project networks. Temporal analysis, scheduling and cost minimization / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Project scheduling with inventory constraints / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints. / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Scheduling of continuous and discontinuous material flows with intermediate storage restrictions / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Q3426442 / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Q2776575 / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Q3426435 / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: The resource renting problem subject to temporal constraints / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Knowledge integration using problem spaces: A study in resource-constrained project scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Activity consolidation to improve responsiveness / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Probe backtrack search for minimal perturbation in dynamic scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Allocation of partially renewable resources: Concept, capabilities, and applications / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Environment-oriented project scheduling for the dismantling of buildings / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Batch scheduling in process industries: An application of resource-constrained project scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Multiobjective network scheduling with efficient use of renewable and nonrenewable resources / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: DSS for multiobjective project scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Resource-constrained project scheduling. Exact methods for the multi-mode case / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Multilevel capacitated lot-sizing and resource-constrained project scheduling: an integrating perspective / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A review of the contribution of operational research to project management / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Scheduling projects with heterogeneous resources to meet time and quality objectives / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Analysis of supplier buyer relationships using resource constrained project scheduling strategies / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: An equitable approach to the payment scheduling problem in project management / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A classification of predictive-reactive project scheduling procedures / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Scheduling an R&D Project with Quality-Dependent Time Slots / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Maximizing the net present value of a project with linear time-dependent cash flows / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Discrete time/cost trade-offs in project scheduling with time-switch constraints / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Progress payments in project scheduling problems. / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: An evaluation of the adequacy of project network generators with systematically sampled networks / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Using metaheuristics in multiobjective resource constrained project scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Discrete-continuous project scheduling with discounted cash flows - a tabu search approach / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: ON CERTAIN MODELS OF RESOURCE ALLOCATION PROBLEMS / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Project Scheduling with Continuously-Divisible, Doubly Constrained Resources / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Algorithm 520: An Automatic Revised Simplex Method for Constrained Resource Network Scheduling [H] / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Robust optimization models for project scheduling with resource availability cost / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Finding the critical path in an activity network with time-switch constraints / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: Disruption management for resource-constrained project scheduling / rank |
| | Normal rank |
| Property / cites work |
| | |
| Property / cites work: A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem / rank |
| | Normal rank |