Hybrid flowshop scheduling with interstage job transportation (Q489104): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s40305-014-0040-4 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2056941025 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated Production and Outbound Distribution Scheduling: Review and Extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine flowshop scheduling with intermediate transportation under job physical space consideration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bounds for Certain Multiprocessing Anomalies / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-Stage, Hybrid Flowshop Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with transportation considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3883869 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The hybrid flow shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling algorithms for flexible flowshops: Worst and average case performance / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling Parts in a Combined Production-transportation Work Cell / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5286651 / rank
 
Normal rank

Latest revision as of 14:54, 9 July 2024

scientific article
Language Label Description Also known as
English
Hybrid flowshop scheduling with interstage job transportation
scientific article

    Statements

    Hybrid flowshop scheduling with interstage job transportation (English)
    0 references
    0 references
    0 references
    27 January 2015
    0 references
    0 references
    0 references
    0 references
    0 references
    hybrid flowshop scheduling
    0 references
    transportation
    0 references
    approximation heuristic
    0 references
    0 references