The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model (Q1664892): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(5 intermediate revisions by 4 users not shown)
Property / author
 
Property / author: Alf Kimms / rank
Normal rank
 
Property / author
 
Property / author: Paulo Morelato França / rank
Normal rank
 
Property / author
 
Property / author: Alf Kimms / rank
 
Normal rank
Property / author
 
Property / author: Paulo Morelato França / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q57719407 / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1155/2015/182781 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1588119261 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Computational Complexity of the Capacitated Lot Size Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analysis of relaxations for the multi-item capacitated lot-sizing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multilevel capacitated lotsizing complexity and LP-based heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: COMBINING PROCESS SELECTION AND LOT SIZING MODELS FOR PRODUCTION SCHEDULING OF ELECTROFUSED GRAINS / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production setup-sequencing and lot-sizing at an animal nutrition plant through ATSP subtour elimination and patching / rank
 
Normal rank
Property / cites work
 
Property / cites work: METAHEURISTIC APPROACHES FOR THE MULTILEVEL RESOURCE-CONSTRAINED LOT-SIZING PROBLEM WITH SETUP AND LEAD TIMES / rank
 
Normal rank
Property / cites work
 
Property / cites work: An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid multi-population genetic algorithm applied to solve the multi-level capacitated lot sizing problem with backlogging / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lead time considerations for the multi-level capacitated lot-sizing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Demand shuffle?A method for multilevel proportional lot sizing and scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4349430 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lotsizing and Scheduling on Parallel Machines with Sequence-Dependent Setup Costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: GRASP heuristic with path-relinking for the multi-plant capacitated lot sizing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rolling-horizon lot-sizing when set-up times are sequence-dependent / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation / rank
 
Normal rank
Property / cites work
 
Property / cites work: The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine multi-product capacitated lot sizing with sequence-dependent setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot sizing and scheduling -- survey and extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling industrial lot sizing problems: a review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simultaneous lotsizing and scheduling on parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simultaneous lotsizing and scheduling by combining local search with dual reoptimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batch delivery scheduling with multiple decentralized manufacturers / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solution approaches for the soft drink integrated production lot sizing and scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm/mathematical programming approach to solve a two-level soft drink production problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Um modelo de otimização para o problema integrado de dimensionamento de lotes e programação da produção em fábricas de refrigerantes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem / rank
 
Normal rank

Latest revision as of 10:40, 16 July 2024

scientific article
Language Label Description Also known as
English
The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model
scientific article

    Statements

    The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    27 August 2018
    0 references
    Summary: This paper presents the synchronized and integrated two-level lot sizing and scheduling problem (SITLSP). This problem is found in beverage production, foundry, glass industry, and electrofused grains, where the production processes have usually two interdependent levels with sequence-dependent setups in each level. For instance, in the first level of soft drink production, raw materials are stored in tanks flowing to production lines in the second level. The amount and the time the raw materials and products have to be stored and produced should be determined. A synchronization problem occurs because the production in lines and the storage in tanks have to be compatible with each other throughout the time horizon. The SITLSP and its mathematical model are described in detail by this paper. The lack of similar models in the literature has led us to also propose a set of instances for the SITLSP, based on data provided by a soft drink company. Thus, a set of benchmark results for these problem instances are established using an exact method available in an optimization package. Moreover, results for two relaxations proved that the modeling methodology could be useful in real-world applications.
    0 references
    0 references

    Identifiers