Multiobjective joint optimization of production scheduling and maintenance planning in the flexible job-shop problem (Q1666440): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(5 intermediate revisions by 4 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1155/2015/725460 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2159079093 / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q59119053 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bi-objective ant colony optimization approach to optimize production and maintenance scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production scheduling and maintenance policy for robustness in a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Joint optimization of maintenance, buffer, and spare parts for a production system / rank
 
Normal rank

Latest revision as of 10:59, 16 July 2024

scientific article
Language Label Description Also known as
English
Multiobjective joint optimization of production scheduling and maintenance planning in the flexible job-shop problem
scientific article

    Statements

    Multiobjective joint optimization of production scheduling and maintenance planning in the flexible job-shop problem (English)
    0 references
    0 references
    0 references
    27 August 2018
    0 references
    Summary: In order to solve the joint optimization of production scheduling and maintenance planning problem in the flexible job-shop, a multiobjective joint optimization model considering the maximum completion time and maintenance costs per unit time is established based on the concept of flexible job-shop and preventive maintenance. A weighted sum method is adopted to eliminate the index dimension. In addition, a double-coded genetic algorithm is designed according to the problem characteristics. The best result under the circumstances of joint decision-making is obtained through multiple simulation experiments, which proves the validity of the algorithm. We can prove the superiority of joint optimization model by comparing the result of joint decision-making project with the result of independent decision-making project under fixed preventive maintenance period. This study will enrich and expand the theoretical framework and analytical methods of this problem; it provides a scientific decision analysis method for enterprise to make production plan and maintenance plan.
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references