Integrating preventive maintenance planning and production scheduling under reentrant job shop (Q1993028): Difference between revisions
From MaRDI portal
Set OpenAlex properties. |
ReferenceBot (talk | contribs) Changed an Item |
||
(One intermediate revision by one other user not shown) | |||
Property / Wikidata QID | |||
Property / Wikidata QID: Q59147712 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Re-entrant lines / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Modeling the reentrant job shop scheduling problem with setups for metaheuristic searches / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Bi-objective ant colony optimization approach to optimize production and maintenance scheduling / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Planning Machine Maintenance in Two-Machine Shop Scheduling / rank | |||
Normal rank |
Latest revision as of 05:36, 17 July 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Integrating preventive maintenance planning and production scheduling under reentrant job shop |
scientific article |
Statements
Integrating preventive maintenance planning and production scheduling under reentrant job shop (English)
0 references
5 November 2018
0 references
Summary: This paper focuses on a preventive maintenance plan and production scheduling problem under reentrant Job Shop in semiconductor production. Previous researches discussed production scheduling and preventive maintenance plan independently, especially on reentrant Job Shop. Due to reentrancy, reentrant Job Shop scheduling is more complex than the standard Job Shop which belongs to NP-hard problems. Reentrancy is a typical characteristic of semiconductor production. What is more, the equipment of semiconductor production is very expensive. Equipment failure will affect the normal production plan. It is necessary to maintain it regularly. So, we establish an integrated and optimal mathematical model. In this paper, we use the hybrid particle swarm optimization algorithm to solve the problem for it is highly nonlinear and discrete. The proposed model is evaluated through some simple simulation experiments and the results show that the model works better than the independent decision-making model in terms of minimizing maximum completion time.
0 references
0 references
0 references