Double girder bridge crane with double cycling: scheduling strategy and performance evaluation (Q2336415): Difference between revisions

From MaRDI portal
Created claim: Wikidata QID (P12): Q59051310, #quickstatements; #temporary_batch_1711234560214
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: A survey of variants and extensions of the resource-constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Operations research at container terminals: a literature update / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of berth allocation and quay crane scheduling problems in container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: Crane scheduling with spatial constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic for the quay crane scheduling problem based on contiguous bay crane operations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Container sequencing for quay cranes with internal reshuffles / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling and solving rich quay crane scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated scheduling of crane handling and truck transportation in a maritime container terminal / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for multimode scheduling problems with dedicated resources / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling the production of rolling ingots: industrial context, model, and solution method / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production scheduling with alternative process plans / rank
 
Normal rank
Property / cites work
 
Property / cites work: Constraint propagation techniques for the disjunctive scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times / rank
 
Normal rank

Latest revision as of 23:32, 20 July 2024

scientific article
Language Label Description Also known as
English
Double girder bridge crane with double cycling: scheduling strategy and performance evaluation
scientific article

    Statements

    Double girder bridge crane with double cycling: scheduling strategy and performance evaluation (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    19 November 2019
    0 references
    Summary: This paper introduces a novel quay crane design, double girder bridge crane (DGBC). DGBC is capable of handling containers of two adjacent bays simultaneously, avoiding crane collisions, saving travelling and reposition cost, and eventually improving terminal efficiency. This problem is formulated as a resource-constrained project scheduling with objective to minimize the maximum completion time. A two-stage heuristic algorithm is proposed in which an operating sequences on each bay is obtained by double cycling, and the integrated timetable for both bays is constructed by solving resource conflicts using the proposed minimum cost strategy. We examine effectiveness and performance of applying DGBC with double cycling. A case study is presented to illustrate how DGBC works with the two-stage method. Three extreme cases with respective conflict types are investigated to develop the performance bounds of DGBC with double cycling. The results show that DGBC can significantly improve terminal productivity, and outperforms single girder crane in both makespan and the lift operation percentage. The highest DGBC efficiency does not require maximum double cycles in two bay schedules; rather the integrated timetable for two bays is the main contribution to the DGBC performance as it yields better cooperation between two spreaders and the driver.
    0 references

    Identifiers