Hybrid flow shop with unrelated machines, setup time, and work in progress buffers for bi-objective optimization of tortilla manufacturing (Q2283857): Difference between revisions

From MaRDI portal
Created claim: Wikidata QID (P12): Q129850906, #quickstatements; #temporary_batch_1724796091478
Import241208061232 (talk | contribs)
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.3390/a11050068 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.3390/A11050068 / rank
 
Normal rank

Latest revision as of 19:52, 17 December 2024

scientific article
Language Label Description Also known as
English
Hybrid flow shop with unrelated machines, setup time, and work in progress buffers for bi-objective optimization of tortilla manufacturing
scientific article

    Statements

    Hybrid flow shop with unrelated machines, setup time, and work in progress buffers for bi-objective optimization of tortilla manufacturing (English)
    0 references
    0 references
    13 January 2020
    0 references
    Summary: We address a scheduling problem in an actual environment of the tortilla industry. Since the problem is NP hard, we focus on suboptimal scheduling solutions. We concentrate on a complex multistage, multiproduct, multimachine, and batch production environment considering completion time and energy consumption optimization criteria. The production of wheat-based and corn-based tortillas of different styles is considered. The proposed bi-objective algorithm is based on the known Nondominated Sorting Genetic Algorithm II (NSGA-II). To tune it up, we apply statistical analysis of multifactorial variance. A branch and bound algorithm is used to assert obtained performance. We show that the proposed algorithms can be efficiently used in a real production environment. The mono-objective and bi-objective analyses provide a good compromise between saving energy and efficiency. To demonstrate the practical relevance of the results, we examine our solution on real data. We find that it can save 48\% of production time and 47\% of electricity consumption over the actual production.
    0 references
    multiobjective genetic algorithm
    0 references
    hybrid flow shop
    0 references
    setup time
    0 references
    energy optimization
    0 references
    production environment
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references