Scheduling a flowline manufacturing cell with sequence dependent family setup times (Q1580980): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Heuristic Algorithm for the <i>n</i> Job, <i>m</i> Machine Sequencing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Evaluation of Flow Shop Sequencing Heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: FLOWSHOP SCHEDULES WITH SEQUENCE DEPENDENT SETUP TIMES / rank
 
Normal rank
Property / cites work
 
Property / cites work: The two-machine sequence dependent flowshop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey and evaluation of static flowshop scheduling heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new heuristic method for the flow shop sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3479795 / rank
 
Normal rank

Latest revision as of 14:00, 30 May 2024

scientific article
Language Label Description Also known as
English
Scheduling a flowline manufacturing cell with sequence dependent family setup times
scientific article

    Statements

    Scheduling a flowline manufacturing cell with sequence dependent family setup times (English)
    0 references
    0 references
    0 references
    0 references
    23 November 2000
    0 references
    flowshop scheduling
    0 references
    manufacturing cells
    0 references
    heuristic algorithms
    0 references
    empirical results
    0 references

    Identifiers