Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation (Q1847225): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Set OpenAlex properties.
 
(4 intermediate revisions by 4 users not shown)
Property / describes a project that uses
 
Property / describes a project that uses: OR-Library / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Heuristic Algorithm for the <i>n</i> Job, <i>m</i> Machine Sequencing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Evaluation of Flow Shop Sequencing Heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey and annotated bibliography of multiobjective combinatorial optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Complexity of Flowshop and Jobshop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop sequencing with mean flowtime objective / rank
 
Normal rank
Property / cites work
 
Property / cites work: AN ADJACENT PAIRWISE APPROACH TO THE MEAN FLOW-TIME SCHEDULING PROBLEM / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiple and bicriteria scheduling: A literature survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-Stage Flowshop Scheduling Problem with Bicriteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for scheduling in flowshop with multiple objectives / rank
 
Normal rank
Property / cites work
 
Property / cites work: An efficient heuristic approach to the scheduling of jobs in a flowshop / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bicriteria approach to the two-machine flow shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Mixed-Integer Goal-Programming Formulation of the Standard Flow-Shop Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bicriteria two-machine permutation flowshop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some efficient heuristic methods for the flow shop sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Benchmarks for basic scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3820362 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic algorithm for mean flowtime objective in flowshop scheduling / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/s0377-2217(01)00278-8 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2065768294 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 09:24, 30 July 2024

scientific article
Language Label Description Also known as
English
Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation
scientific article

    Statements

    Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation (English)
    0 references
    0 references
    0 references
    0 references
    17 November 2002
    0 references
    Scheduling
    0 references
    Sequencing
    0 references
    Flowshop
    0 references
    Heuristic
    0 references
    Bi-criteria problems
    0 references

    Identifiers