Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints (Q4921223): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / describes a project that uses
 
Property / describes a project that uses: CPLEX / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1111/j.1475-3995.2012.00876.x / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2061140917 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Shop Problems With Two Machines and Time Lags / rank
 
Normal rank
Property / cites work
 
Property / cites work: Permutation flowshop scheduling problems with maximal and minimal time lags / rank
 
Normal rank
Property / cites work
 
Property / cites work: Permutation flow shops with exact time lags to minimise maximum lateness / rank
 
Normal rank
Property / cites work
 
Property / cites work: Handbook of metaheuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: Local search heuristics for two-stage flow shop problems with secondary criterion / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch and bound algorithm to minimize the number of late jobs in a permutation flow-shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4124328 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiple and bicriteria scheduling: A literature survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Genetic algorithms for the two-stage bicriteria flowshop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-Stage Flowshop Scheduling Problem with Bicriteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multicriteria scheduling problems: a survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine flowshop scheduling with a secondary criterion / rank
 
Normal rank

Latest revision as of 10:26, 6 July 2024

scientific article; zbMATH DE number 6165402
Language Label Description Also known as
English
Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints
scientific article; zbMATH DE number 6165402

    Statements

    Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints (English)
    0 references
    0 references
    0 references
    0 references
    23 May 2013
    0 references
    permutation flow shop
    0 references
    time lags
    0 references
    lexicographic optimization
    0 references
    mathematical programming
    0 references
    simulated annealing
    0 references

    Identifiers