A survey of scheduling problems with setup times or costs (Q2467249): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Import241208061232 (talk | contribs)
Normalize DOI.
 
(5 intermediate revisions by 5 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2006.06.060 / rank
Normal rank
 
Property / describes a project that uses
 
Property / describes a project that uses: VRP / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2157793635 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling parallel machines with a single server: Some solvable cases and heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: Equal processing and equal setup time cases of scheduling parallel machines with a single server / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling two parallel machines with a single server: the general case / rank
 
Normal rank
Property / cites work
 
Property / cites work: An agent-based approach for scheduling multiple machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Using a hybrid evolutionary algorithm to minimize variance in response time for multimedia object requests / rank
 
Normal rank
Property / cites work
 
Property / cites work: A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: Cyclic scheduling heuristics for a re-entrant job shop manufacturing environment / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times / rank
 
Normal rank
Property / cites work
 
Property / cites work: The significance of reducing setup times/setup costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3436602 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Group technology in a hybrid flowshop environment: a case study / rank
 
Normal rank
Property / cites work
 
Property / cites work: Robust scheduling of parallel machines with sequence-dependent set-up costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5437769 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with shutdowns and sequence dependent set-up times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing setup costs for parallel multi-purpose machines under load-balancing constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: A \(\frac 6 5\)-approximation algorithm for the two-machine routing open-shop problem on a two-node network / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling job families about an unrestricted common due date on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling parallel machines to minimize weighted flowtime with family set-up times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4943562 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing maximum lateness with job families / rank
 
Normal rank
Property / cites work
 
Property / cites work: One-Operator, Two-Machine Open Shop And Flow Shop Scheduling With Setup Times For Machines And Maximum Lateness Objective / rank
 
Normal rank
Property / cites work
 
Property / cites work: One-operator, two-machine open shop and flow shop problems with setup times for machines and weighted number of tardy jobs objective / rank
 
Normal rank
Property / cites work
 
Property / cites work: Early/tardy scheduling with sequence dependent setups on uniform parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Job shop scheduling with setup times, deadlines and precedence constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batching identical jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: On Minimizing Total Tardiness in a Serial Batching Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a single machine to minimize a regular objective function under setup constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: An integrated system solution for supply chain optimization in the chemical process industry / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flow Shop No-Wait Scheduling With Sequence Dependent Setup Times And Release Dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: A tabu search algorithm for parallel machine total tardiness problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: The complexity of two group scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Total flowtime and makespan for a no-wait <i>m</i>-machine flowshop with set-up times separated / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batch scheduling with deadlines on parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complexity results for parallel machine problems with a single server / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complexity results for flow-shop problems with a single server / rank
 
Normal rank
Property / cites work
 
Property / cites work: Exact algorithms for scheduling multiple families of jobs on parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling with common due data assignment in a group technology environment / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machine batching and scheduling with deadlines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a single server in a two-machine flow shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: One-machine batching and sequencing of multiple-type items / rank
 
Normal rank
Property / cites work
 
Property / cites work: One-operator-two-machine flowshop scheduling with setup and dismounting times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4949162 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on the complexity of family scheduling to minimize the number of late jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine batch scheduling with resource dependent setup and processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: The single machine batching problem with family setup times to minimize maximum lateness is strongly NP-hard / rank
 
Normal rank
Property / cites work
 
Property / cites work: A stronger complexity result for the single machine multi-operation jobs scheduling problem to minimize the number of tardy jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production planning problems in printed circuit board assembly / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5437770 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batch-processing scheduling with setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size / rank
 
Normal rank
Property / cites work
 
Property / cites work: Decomposition methods for reentrant flow shops with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on minimizing maximum lateness in a two-machine no-wait flowshop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot sizing and scheduling -- survey and extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: A comparison of branch-and-bound algorithms for a family scheduling problem with identical parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic methods for the identical parallel machine flowtime problem with set-up times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lower bounds and algorithms for flowtime minimization on a single machine with set-up times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling of wafer test processes in semiconductor manufacturing / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bicriteria scheduling with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Permutation flow shops with exact time lags to minimise maximum lateness / rank
 
Normal rank
Property / cites work
 
Property / cites work: A memetic algorithm for the total tardiness single machine scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: On-line scheduling with setup costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A divide and merge heuristic for the multiprocessor scheduling problem with sequence dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling multi-operation jobs on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling the production of two-component jobs on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling for parallel dedicated machines with a single server / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling Batches with Sequential Job Processing for Two-Machine Flow and Open Shops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4934199 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing flow time in a flow-line manufacturing cell with family setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for single machine total tardiness scheduling with sequence dependent setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machine scheduling with a common server / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling and lot streaming in flowshops with no-wait in process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Competitive online scheduling of perfectly malleable jobs with setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the sum of job earliness and tardiness in a multimachine system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with batching: Two job types / rank
 
Normal rank
Property / cites work
 
Property / cites work: A two-stage hybrid flowshop with uniform machines and setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: List scheduling in a parallel machine environment with precedence constraints and setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production sequencing problem with re-entrant work flows and sequence dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Asymptotically optimal schedules for single-server flow shop problems with setup costs and times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine group scheduling with resource dependent setup and processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Constructing near optimal schedules for the flow-shop lot streaming problem with sublot-attached setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing sum of completion times on a single machine with sequence-dependent family setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine shop scheduling problems with batch processing / rank
 
Normal rank
Property / cites work
 
Property / cites work: A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots / rank
 
Normal rank
Property / cites work
 
Property / cites work: An adaptive TS approach to JIT sequencing with variable processing times and sequence-dependent setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling two parallel semiautomatic machines to minimize machine interference / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling problems with past-sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batching decisions for assembly production systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machine scheduling problems with a single server / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic algorithm for minimizing mean flow time with unit setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic scheduling of parallel machines with sequence-dependent set-up times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling flexible flow lines with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: The vehicle routing problem: An overview of exact and approximate algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Comparative analysis of order-input sequencing heuristics in a cellular flexible assembly system for large products / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing sum of completion times for batch scheduling of jobs with deteriorating processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop Scheduling of Robotic Cells with Job-dependent Transportation and Set-up Effects / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fabrication scheduling on a single machine with due date constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batch scheduling in the no-wait two-machine flowshop to minimize the makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine flowshop batching and scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with job release dates, delivery times and preemption penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total completion time subject to job release dates and preemption penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the number of late jobs under the group technology assumption / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling groups of unit length jobs on two identical parallel machines. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid genetic algorithm for the single machine scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on flow-shop and job-shop batch scheduling with identical processing-time jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: A single machine batch scheduling problem with bounded batch size / rank
 
Normal rank
Property / cites work
 
Property / cites work: Open-shop batch scheduling with identical jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flow-shop batch scheduling with identical processing-time jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing flow-time on a single machine with integer batch sizes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal sequencing in the presence of setup times for tow/barge traffic through a river lock / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on the single machine serial batching scheduling problem to minimize maximum lateness with precedence constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Strong NP-hardness of the single machine multi-operation jobs total completion time scheduling problem. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batch scheduling with controllable setup and processing times to minimize total completion time / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the single machine serial batching scheduling problem to minimize total completion time with precedence constraints, release dates and identical processing times. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine batch scheduling with jointly compressible setup and processing times. / rank
 
Normal rank
Property / cites work
 
Property / cites work: The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Group scheduling with controllable setup and processing times: minimizing total weighted completion time / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm methodology for complex scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic approach for single-machine scheduling with due dates and class setups. / rank
 
Normal rank
Property / cites work
 
Property / cites work: The wafer probing scheduling problem (WPSP) / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for the wafer probing scheduling problem with sequence-dependent set-up time and due date restrictions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with batching: A review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-bound algorithm for the early/tardy machine scheduling problem with a common due-date and sequence-dependent setup time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics and sequence-dependent set-up jobs in flow line cells / rank
 
Normal rank
Property / cites work
 
Property / cites work: An enhanced TSP-based heuristic for makespan minimization in a flow shop with setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: The flow shop scheduling polyhedron with setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some effective heuristics for no-wait flowshops with setup times to minimize total completion time / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling realistic hybrid flexible flowshop scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling with family setups to minimize total earliness and tardiness / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a flowline manufacturing cell with sequence dependent family setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing <i>L</i> <sub>max</sub> for the single machine scheduling problem with family set-ups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4252357 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machine scheduling with earliness and tardiness penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new dynamic programming formulation of (n x m) flowshop sequencing problems with due dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: The CLWS heuristic for single machine scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A cutting plane algorithm for a single machine scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the application of insertion techniques for job shop problems with setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Earliness-tardiness scheduling with setup considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynasearch for the earliness-tardiness scheduling problem with release dates and setup constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two models for a family of flowshop sequencing problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Group technology approach to the open shop scheduling problem with batch setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling problem in a two-machine flow line with the<i>N</i>-step prior-job-dependent set-up times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Non-approximability of precedence-constrained sequencing to minimize setups. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two MILP models for the N × M SDST flowshop sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A penalty-based heuristic algorithm for the permutation flowshop scheduling problem with sequence-dependent set-up times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A tabu search approach to machine scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing jobs that require common resources on a single machine: A solvable case of the TSP / rank
 
Normal rank
Property / cites work
 
Property / cites work: The scheduling problem of PCBs for multiple non-identical parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stochastic sequencing with job families, set-up times, and due dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analytical models to predict the performance of a single-machine system under periodic and event-driven rescheduling strategies / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improved dynamic programs for some batching problems involving the maximum lateness criterion / rank
 
Normal rank
Property / cites work
 
Property / cites work: An approximation algorithm for parallel machine scheduling with a common server / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine flowshop scheduling with job class setups to minimize total flowtime / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic approach for two-machine no-wait flowshop scheduling with due dates and class setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic programming algorithms for scheduling parallel machines with family setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for scheduling job families on a single machine with arbitrary earliness/tardiness penalties and an unrestricted common due date / rank
 
Normal rank
Property / cites work
 
Property / cites work: A polynomial-time approximation scheme for single-machine sequencing with delivery times and sequence-independent batch set-up times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machine scheduling with splitting jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal scheduling of two-component products on a single facility / rank
 
Normal rank
Property / cites work
 
Property / cites work: Learning and forgetting effects on a group scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine flowshop group scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Survey of scheduling research involving setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flow-shop scheduling with setup and assembly operations / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on the single machine serial batching scheduling problem to minimize maximum lateness with identical processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine batch scheduling problem with family setup times and release dates to minimize makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling the reentrant job shop scheduling problem with setups for metaheuristic searches / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2006.06.060 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 19:58, 18 December 2024

scientific article
Language Label Description Also known as
English
A survey of scheduling problems with setup times or costs
scientific article

    Statements

    A survey of scheduling problems with setup times or costs (English)
    0 references
    0 references
    21 January 2008
    0 references
    scheduling
    0 references
    setup time
    0 references
    setup cost
    0 references
    survey (review)
    0 references
    single machine
    0 references
    parallel machines
    0 references
    flow shop
    0 references
    job shop
    0 references
    open shop
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references

    Identifiers