Batch scheduling in a two-stage flexible flow shop problem (Q902743): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.2478/fcds-2014-0001 / rank | |||
Property / DOI | |||
Property / DOI: 10.2478/FCDS-2014-0001 / rank | |||
Normal rank |
Latest revision as of 07:54, 10 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Batch scheduling in a two-stage flexible flow shop problem |
scientific article |
Statements
Batch scheduling in a two-stage flexible flow shop problem (English)
0 references
4 January 2016
0 references
deterministic scheduling
0 references
flexible flowshop
0 references
batch scheduling
0 references
0 references
0 references
0 references
0 references