Temporary workforce planning with firm contracts: a model and a simulated annealing heuristic (Q541451): Difference between revisions
From MaRDI portal
Created a new Item |
ReferenceBot (talk | contribs) Changed an Item |
||
(6 intermediate revisions by 6 users not shown) | |||
Property / review text | |||
Summary: The aim of this paper is to introduce a model for temporary staffing when temporary employment is managed by firm contracts and to propose a simulated annealing-based method to solve the model. Temporary employment is a policy frequently used to adjust the working hour capacity to fluctuating demand. Temporary workforce planning models have been unnecessarily simplified to account for only periodic hiring and laying off; a company can review its workforce requirement every period and make hire-fire decisions accordingly, usually with a layoff cost. We present a more realistic temporary workforce planning model that assumes a firm contract between the worker and the company, which can extend to several periods. The model assumes the traditional constraints, such as inventory balance constraints, worker availability, and labor hour mix. The costs are the inventory holding cost, training cost of the temporary workers, and the backorder cost. The mixed integer model developed for this case has been found to be difficult to solve even for small problem sizes; therefore, a simulated annealing algorithm is proposed to solve the mixed integer model. The performance of the SA algorithm is compared with the CPLEX solution. | |||
Property / review text: Summary: The aim of this paper is to introduce a model for temporary staffing when temporary employment is managed by firm contracts and to propose a simulated annealing-based method to solve the model. Temporary employment is a policy frequently used to adjust the working hour capacity to fluctuating demand. Temporary workforce planning models have been unnecessarily simplified to account for only periodic hiring and laying off; a company can review its workforce requirement every period and make hire-fire decisions accordingly, usually with a layoff cost. We present a more realistic temporary workforce planning model that assumes a firm contract between the worker and the company, which can extend to several periods. The model assumes the traditional constraints, such as inventory balance constraints, worker availability, and labor hour mix. The costs are the inventory holding cost, training cost of the temporary workers, and the backorder cost. The mixed integer model developed for this case has been found to be difficult to solve even for small problem sizes; therefore, a simulated annealing algorithm is proposed to solve the mixed integer model. The performance of the SA algorithm is compared with the CPLEX solution. / rank | |||
Normal rank | |||
Property / Mathematics Subject Classification ID | |||
Property / Mathematics Subject Classification ID: 90B30 / rank | |||
Normal rank | |||
Property / Mathematics Subject Classification ID | |||
Property / Mathematics Subject Classification ID: 90B70 / rank | |||
Normal rank | |||
Property / Mathematics Subject Classification ID | |||
Property / Mathematics Subject Classification ID: 91B40 / rank | |||
Normal rank | |||
Property / zbMATH DE Number | |||
Property / zbMATH DE Number: 5904884 / rank | |||
Normal rank | |||
Property / describes a project that uses | |||
Property / describes a project that uses: CPLEX / rank | |||
Normal rank | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2089562803 / rank | |||
Normal rank | |||
Property / Wikidata QID | |||
Property / Wikidata QID: Q58692805 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Determining optimal pool size of a temporaray call-in work force / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Optimizing the use of contingent labor when demand is uncertain / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Workforce Planning in Mixed Model Assembly Systems / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A successive convex approximation method for multistage workforce capacity planning problem with turnover / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A simulated annealing approach to the cyclic staff-scheduling problem / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A Simulated Annealing Approach to the Solution of Flexible Labour Scheduling Problems / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A simulated-annealing heuristic for shift scheduling using non-continuously available employees / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Manpower allocation with time windows and job-teaming constraints / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A simulated annealing approach to the solution of job rotation scheduling problems / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q4427313 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A simulated annealing algorithm for single machine scheduling problems with family setups / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Simulated annealing and tabu search for multi-mode project payment scheduling / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A simulated annealing approach for the multi-periodic rail-car fleet sizing problem / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Optimization by Simulated Annealing / rank | |||
Normal rank | |||
links / mardi / name | links / mardi / name | ||
Latest revision as of 02:58, 4 July 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Temporary workforce planning with firm contracts: a model and a simulated annealing heuristic |
scientific article |
Statements
Temporary workforce planning with firm contracts: a model and a simulated annealing heuristic (English)
0 references
7 June 2011
0 references
Summary: The aim of this paper is to introduce a model for temporary staffing when temporary employment is managed by firm contracts and to propose a simulated annealing-based method to solve the model. Temporary employment is a policy frequently used to adjust the working hour capacity to fluctuating demand. Temporary workforce planning models have been unnecessarily simplified to account for only periodic hiring and laying off; a company can review its workforce requirement every period and make hire-fire decisions accordingly, usually with a layoff cost. We present a more realistic temporary workforce planning model that assumes a firm contract between the worker and the company, which can extend to several periods. The model assumes the traditional constraints, such as inventory balance constraints, worker availability, and labor hour mix. The costs are the inventory holding cost, training cost of the temporary workers, and the backorder cost. The mixed integer model developed for this case has been found to be difficult to solve even for small problem sizes; therefore, a simulated annealing algorithm is proposed to solve the mixed integer model. The performance of the SA algorithm is compared with the CPLEX solution.
0 references
0 references
0 references
0 references