Temporary workforce planning with firm contracts: a model and a simulated annealing heuristic
From MaRDI portal
Publication:541451
DOI10.1155/2011/209693zbMath1213.90108OpenAlexW2089562803WikidataQ58692805 ScholiaQ58692805MaRDI QIDQ541451
Publication date: 7 June 2011
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://eudml.org/doc/230364
Related Items (1)
Uses Software
Cites Work
- Unnamed Item
- Optimization by Simulated Annealing
- A simulated annealing approach for the multi-periodic rail-car fleet sizing problem
- A simulated annealing algorithm for single machine scheduling problems with family setups
- Simulated annealing and tabu search for multi-mode project payment scheduling
- Determining optimal pool size of a temporaray call-in work force
- Optimizing the use of contingent labor when demand is uncertain
- A simulated-annealing heuristic for shift scheduling using non-continuously available employees
- A simulated annealing approach to the solution of job rotation scheduling problems
- A successive convex approximation method for multistage workforce capacity planning problem with turnover
- A Simulated Annealing Approach to the Solution of Flexible Labour Scheduling Problems
- Workforce Planning in Mixed Model Assembly Systems
- Manpower allocation with time windows and job-teaming constraints
- A simulated annealing approach to the cyclic staff-scheduling problem
This page was built for publication: Temporary workforce planning with firm contracts: a model and a simulated annealing heuristic